Short answer

A typical full re-stucco on a single-family home takes about 2–4 weeks from tear-off to final finish. Repairs usually take 1–3 days plus cure time. Much of the schedule is curing between coats — the brown coat needs roughly a week before the finish goes on.

Stucco can’t be rushed. Each coat needs time to cure, and that time is what keeps the wall from cracking early.

Typical timeline for a full re-stucco

  1. Prep and protection — 1 day: scaffold, plastic on windows, landscaping covered.
  2. Tear-off — 1–3 days, depending on size and access.
  3. Paper, lath and flashing — 2–4 days, plus an inspection if a permit is required.
  4. Scratch coat — 1–2 days, moist-cured.
  5. Brown coat — 1–2 days, then about a week of curing.
  6. Finish coat — 1–3 days, then clean-up and a final walk.

Altogether that is usually 2–4 weeks for a single-family home. Two-story homes, hillside access, heavy trim or hidden damage add time.

Other jobs

  • Repairs and patches — 1–3 days of work, spread over several days for curing.
  • Re-coat over sound stucco — usually about 1–2 weeks.

When we can start

Lead times are typically 2–6 weeks for residential work, depending on the season. You will get an honest schedule in writing before you commit.

Answered by The Southwest Stucco Family, Southwest Stucco Inc. — CSLB License #702110. Last reviewed .

Free Estimate

Ready for a free estimate?no pressure.

We respond within 24 hours — usually the same day.

Call Now